DAVIS & DAVIS DESIGN BUILD
About us
3 EMPLOYEES. USES SUBS FOR ELECTRICAL, PLUMBING, HVAC, TILE, & DRYWALL TAPING. COST DETERMINED BY THE JOB. NO TRAVEL CHARGES. NO SERVICE FEE. MAY CONTACT THROUGH E-MAIL.
Business highlights
Services we offer
ARCHITECTURAL DESIGN SERVICES., INTERIOR & EXTERIOR REMODELING, REMODELING- ROOM ADDITIONS
Number of Stars | Image of Distribution | Number of Ratings |
---|---|---|
86% | ||
0% | ||
14% | ||
0% | ||
0% |
We reached out to Davis &Davis after seeing several of their projects on the Mpls-ST Paul Home Tour. Ms Davis (Architect) was quick to respond and setup time to come to our house. We wanted to have architectural drawings to add a bath in our half story and for a kitchen remodel so we could then get quotes for this work from various contractors for the same scope of work, including Davis & Davis. We also wanted to work with a contactor/architect familiar with working on older Minneapolis homes to ensure that the project would meet Minneapolis city standards & regulations.
Both Davis? came to the meeting and Mr. Davis offered great space utilization ideas for the projects. Ms. Davis produced drawings and incorporated our feedback timely. She billed us promptly for the architecture work and we paid for those services.
The challenges came when requesting a quote for the build work. They indicated that Joe was backed up with projects so would be delayed a bit, which was fine initially, as we were not in a rush for the quote. However, after months of waiting and following up, it became clear that they weren?t interested in our business. After about 3 months & multiple follow up requests, we finally did receive a quote for the work. Mr Davis went through the estimates in detail and when we asked for some changes/updates based on that discussion, he said he would get back to us with the updates. We never heard from him again.
Furthermore, once we did receive estimates from other builders on the project and moved forward with another builder, they looked at the plans and noted that the bathroom plans didn?t meet city code, so we had to pay another designer to draw up new plans for a bathroom in another location that did meet city code. We spent over $1800 for architecture plans that didn?t even meet city codes ? it ended up to be a complete waste time & money!
Licensing
State Contractor License Requirements
All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our Find Licensing Requirements page.
*Contact business to see additional licenses.