First, the crew were excellent. They even sealed the entrance to the house so dust would not enter. The job entailed the garage floor, steps and landing leading to house. Prep took most of a day as floor, steps and landing needed to be ground. By the end of the first day the first coat of epoxy was applied. The second day had the repair all cracks in a 50+ year garage floor, apply a second coat of epoxy and the polymeric particles. The third day entailed removing excess particles, sanding the whole thing and applying a clear coat. Finally, after letting the floor cure for at least 2 days, the crew came back and helped replace the large items in the garage including a refrigerator.