Description of Work: Our project with Hyatt Construction invilved the total renovation of both of the bathrooms in our home. We kept the existing toilet and sink in one, and were responsible for providing all fixtures for the second with the exception of the tub light fixture and a Panasonic light/ceiling fan. Both bathrooms had been stripped down to the studs, sub-floors, and in the case of the main BR, ceiling joists by myself. Substantial water damage to both sub-floors and studs surrounding the bathtub required additional materials and carpentry, for which we were charged a very fair price. | |Renovation of BR one included replacing the old flooring with plywood, fabrication of a multi-layered concrete shower pan, a floor/ceiling tiled shower stall with accents and tiled alcove, backed with Durrock and surrounded by 3/8" tempered glass (including door)with brushed nickle supports and hardware. The shower tile and floor are composed of 12" x 24" porcelain tile, complete with 3" edging, and sealed with epoxy grout. | |Renovation of BR two was comprised of creation of a new plywood floor, a rim-to ceiling tub surround comprised of 3" x 6" subway tile, laying of a tile floor comprised of 12" x 12" sheet tile complete with edging, installation of a Kohler bubble jet tub set in concrete, a new light over the tub, installation of toilet, vanity and sink, crown molding, wood wainscoting and trim, drywall,insulation,pocket door and trim, Durrock sheeting in wet areas, blocking of attachment points and installation of all grab bars, towel racks, etc, and light fixtures. | |Primer and final coat painting in both bathrooms was completed by the contractor. All plumbing (Including correction of a problem created by a previous contractor and installation of two anti-sweat valves for the toilets) and electrical work (which required installation of an additional circuit) and finish work in general was completed by Mr Hyatt and his associates. | |In conclusion, we could not be happier with our new bathrooms. Mr Hyatt and his associate Rodney perform very good work using only the best materials. Their finish work was excellent! Once they clean up and leave, we had a true turn-key operation; everything was clean and ready to use. We spent more money than we wanted to, but in return received a level of quality in materials and construction that we had not expected. | |We would not hesitate to hire Hyatt Construction again for further work on our home. They're true professionals in both attitude and performance.