Top-rated rototilling pros.

Get matched with top rototilling pros in Belleville, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Belleville, KS?

Select your specific project to find the pro for you.

Find Rototilling pros in Belleville

DOWNEY LAWN & LANDSCAPE

2.00(
3
)

DOWNEY LAWN & LANDSCAPE

2.00(
3
)
31 years of experience

In business over 20 years. Areas number 1 volume sod installation company. Sod, sprinkler systems, water features, fire features, patios, decks, pergolas, athletic fields, and much more!

In business over 20 years. Areas number 1 volume sod installation company. Sod, sprinkler systems, water features, fire features, patios, decks, pergolas, athletic fields, and much more!

Rototilling questions, answered by experts

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Pea gravel is hands down a top pick for managing landscape drainage.  These small stones allow water to flow through easily by creating natural gaps that promote runoff. Beyond functionality, pea gravel also offers visual versatility. Homeowners will find a range of earthy tones like gray, brown, blue, and even red, making it easy to match with different outdoor styles and plantings.

When leveling the ground for a pool. If the ground is mostly level, you may be able to simply lay down pavers or pool pads to support the pool. However, you’ll still need to level the ground with sand as a base before adding other materials on top, like crushed gravel.

Yes, hardscaping features bring value to your landscape, and they can even increase the value of your home. Hardscaping works best alongside professional landscaping. According to a survey by the National Association of Realtors and the National Association of Landscape Professionals, researchers found that hardscape upgrades, landscape upgrades, landscape management, and lawn care services are the top four outdoor projects that add value to a property for resale.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.