Top-rated generator install pros.

Get matched with top generator install pros in your area

Enter your zip and get matched with up to 5 pros

Find Generator install pros in Homer

No results for Generator install pro in

Try adjusting your search criteria.
Generator Install questions, answered by experts

Yes, in some locations, it is required by the National Electric Code (NEC) to have a transfer switch installed for electrical emergencies. In addition to following electrical code, generator transfer switches ensure your home is fully protected during a power outage. By switching the power from the main breaker to the generator breaker, you can seamlessly operate your HVAC, lights, appliances, devices, and more during an emergency. 

When choosing the right size generator for your needs, consider a few items to help calculate the wattage you’ll need. Start by determining which household items and appliances you want to power, and then add the wattages together. Check out the wattage of these essential appliances:

  • Refrigerator: 600 watts

  • Large dehumidifier: 700 watts

  • Large window air conditioner: 1,400 watts

  • Water heater: 3,000 watts

Running home appliances like these requires a partial or whole-house generator. A portable generator may be enough to power your home if you only plan to keep a refrigerator and freezer running. 

No, you shouldn’t use an extension cord to plug a generator directly into your home without using a transfer switch. That’s because systems like pumps and HVAC fans need a steady power source that might not be available directly from your generator alone. If you bypass the circuit breaker box, you risk damaging your electrical system, creating a risk of electrical fire or electrical shock to you or any workers repairing lines on your local electrical grid.

As a safety measure, you should always turn off the main breaker while operating your generator’s backup breaker. In addition, you should also switch off all appliance breakers so you don't have a power surge when the main breaker turns back on. And finally, turning off the main breaker prevents back-feeding, which endangers utility workers with the risk of electrocution. Back-feeding could also destroy the electrical circuits of your neighbors if they use the same power network.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

The Homer, in homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"