About us
Owner operated. Uses subs for labor. Cost is determined by the job. No travel charges. No service charges. No extra charge for after hours service. May contact through email.
Business highlights
Services we offer
Remodeling & general construction, new homes, additions, porches, decks, patios, doors, windows, ceramic tile, hardwood flooring, carpet, plumbing, electrical, HVAC, roofing, siding, rough & finished carpentry.
Amenities
Emergency Services
Yes
Free Estimates
Yes
Warranties
Yes
Senior Discount
ask for details
Accepted Payment Methods
- Check
Number of Stars | Image of Distribution | Number of Ratings |
---|---|---|
20% | ||
0% | ||
0% | ||
20% | ||
60% |
Filter reviews by service
him to come out and work on it. I ended up doing a lot of the work myself. The work he did was very sloppy. He couldn?t care less how it looked. Part of the deck was crooked and when I pointed it out to him he told me to plant a tree in front of it. I really regret hiring Liam.
I wouldn't have this builder build me a dog house. Promised to have work done but no one showed up. Nothing but broken promises. The work done was good but everything that was torn out is still not cleaned up. Yard is a mess!
The tradesmen kept garbage in the back yard during the entire project length, although it was put there in the first weeks and should have been removed immediately. When cutting tile, a saw was used indoors instead of scoring and cracking them, which caused a considerable mess in the house. The tile-layer clogged the basement drain while cleaning up his tools and pails, and left the drain for us to unclog. The plumber only worked on Sundays, which is a code violation in the city of Park Ridge for renovation projects. He switched the cold and warm water lines going to the washer. What is worse, when he installed the toilet, he did not see that a plumbing joint was spraying water and left the job that way. It sprayed for over a half-hour until the problem was discovered by chance, and he had to be called back to fix the problem. He had to be coaxed to fix it correctly; during his second atttempt he was ready to leave while it was still dripping. The plumber had two things working against him: his english ability was almost non-existant, and he did not bring enough light to illuminate the work area. He also was not interested in offers to bring him a lamp.
Construction details were occasionally forgotten or not passed on to the tradesmen. This caused delays, because several things had to be redone by the tile-layer, and several tradesmen had to break off their work because details had not been passed on to them. It seemed that language contributed to this problem: the contractor speaks english with a heavy irish accent, and most of the spoke spanish and did not have a good command of english.
Licensing
State Contractor License Requirements
All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our Find Licensing Requirements page.
*Contact business to see additional licenses.