MOORE ELECTRICAL CONTRACTORS
About us
Fully licensed electrical contractor with experienced journeymen in residential and commercial new construction, remodeling and repair,landscape lighting and low voltage lighting. We also specialize in stand-by power for whole home or partial home using Briggs and Stratton generators. Minimum 1 hour fee of $90 (travel time to the job included in that hour).
Business highlights
Services we offer
1 year safety inspections, Audio/Video, Electrical, Home Automation, Home Theater, Landscape lighting, Lighting Audits, Lighting Control, Shades and Shade control, Stand-by power
| Number of Stars | Image of Distribution | Number of Ratings |
|---|---|---|
| 100% | ||
| 0% | ||
| 0% | ||
| 0% | ||
| 0% |
We would definitely use them again. From my first call to the company, to the jobs completion they were very professional!
I only called them after receiving 1 high bid, 2 medium bids and then picking a lower bid from a and quot;man and a cell phoneand quot;, who flaked out on me.
I concluded I want a company that will always answer the phone, that has a physical address that I can go to. Thought that this will cost extra. But in the end I was wrong. Quality electrical work from a great company like Moore can actually cost less because their employees are very skilled and hardworking.
Once the and quot;man and a cell phoneand quot; flaked out on me, I started the bidding process all over. I called Moore. When I called, they were great! But they suggested that I go and quot;time and materialsand quot;, which would be less than if they did a bid. Hmmm, didn't know how that would fly.
Crossed my fingers and went with them. After all was completed they billed me less than any other bid.
Why? Because they have GREAT electricians and they are fast and very hard working.
Don't know what their charges would be like on a very small project, like change one switch.
This was a sizable project and the price I listed above is not the real number.( Don't like to post private stuff.)
Bottomline, if I ever have another good sized project I will not even ask for a bid. I will just say, DO IT!
I have dealt with subs for my project for years and Moore is by far the best. Period!
Here are some tips. If they charge you time and materials, keep track of the time and have the electricians post the materials as they use them. You can even use your own materials and save the upcharge. My numbers and the billed numbers matched, they seem very honest. But it was good to confirm it.
Incidentally by going time and materials I could do changes.. add this; change that. I added all kinds of stuff and no expensive and quot;change ordersand quot;. And still they had the best price.
Since the job was completed I spoke with people I know who used them, they said they will not use anyone else. Same for me.
Licensing
State Contractor License Requirements
All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our Find Licensing Requirements page.
*Contact business to see additional licenses.