Find top-rated Pros in your area

Enter a zip code and get matched to businesses near you.

Steven Heller General Contractor

Doors, Windows, Water & Smoke Damage

Reviews

1.01 Reviews
Number of StarsImage of DistributionNumber of Ratings
5
0%
4
0%
3
0%
2
0%
1
100%


Rating CategoryRating out of 5
quality
1.0
value
1.0
professionalism
1.0
responsiveness
1.0
punctuality
1.0
Showing 1-1 of 1 reviews

Phillip M.
08/2011
1.0
replacement windows, doors
  + 0 more
Terrible. Steven Heller and his work crew abandoned my job before it was completed and has refused to refund any of the balance of my over payment for this one half of the original projects.
Description of Work: Please be advised that in my opinion I have experienced a severe lack of cooperation from Steven Heller (the General Contractor) on our proposed and unfinished renovation to our apartment; which was damaged by a ruptured fire sprinkler head and a golf ball which damaged our apartment and our sliding glass doors on our patio. Steven Heller has not responded to any of our phone calls and/or registered letters to him with regards to the two projects which we hired him for; while representing Southern Coast Enterprises. On July 8, 2010 I signed a contract with an addendum between Mr. Heller’s company, (SCE) to repair my apartment and sliding glass patio doors; the contract was broken down into two projects. Project #1 Replace 6 Sliding Patio doors with Bronze frames and Bronze tinted Hi-Impact windows Project #2 Repair apartments which were damaged from a ruptured fire sprinkler head Steven Heller’s employees/work crew removed the patio doors, framing, sun screen shutters and proceeded with the installation of the 6 sliding patio doors. For which we advanced checks in the total amount of $31,000.00, as a deposit for both projects made payable to SCE which he represents. It was agreed that the Bronze frame and Bronze tinting windows would be installed for $17,000 maximum minus 10% which was to be paid to the public adjuster; (Triumph Consulting), (without any rights to contest as this is the maximum amount agreed to be paid by Universal Property Insurance Company; in the court ordered final appraisal award). As specified in the Addendum to the July 8, 2010 contract. On October 26, 2010 the July 8, 2010 contract was again amended to adjust the estimated total cost of the apartment repairs from $69,000.00 to $48,000.00 (minus the 10% Adjusters fee for the public adjuster Alliance Adjusting Group) as previously agreed to, and that Universal Property would have the final say in the exact payment which they would be responsible for after the court ordered appraisal. This came out to $48,000.00. (This paragraph applied to project two of the contract, repairing the apartment (not the patio doors). Upon the work stoppage by SCE and my inspection of their work the following was observed: Patios Doors frames were scratched severely in several locations on the framing. The glass installed was clear instead of the bronze color ordered. The screening outboard of the patio doors was flapping (from top to the bottom on both sides of the framing) in the wind and was not secured properly. The final finishing (enclosing of support beams and fire proofing) was never done. Final inspection by the Palm Beach County Building Department was never done. Final releases were never delivered (as requested) from SCE and the door manufacturer of the patio doors showing that the doors were paid for, nor any releases from any subcontractors were ever received. (Which I requested on several phone conversations with Skip Bennett of SCE). Therefore, after three certified letter requests, phone calls and a personal appearance to the SCE offices, Steven Heller and SCE have refused to refund my over payment. The difference between the agreed upon fee of $17,000.00 minus the 10% fee ($1,700.00) to Triumph Consulting Group (for adjustment fees to replace my sliding glass patio doors) should have been refunded. $17,000 - $1,700 = $15,300 was the final total cost which was payable to Steven Heller and SCE. The balance of $15,700.00 should have been refunded upon cancellation of our contract. However, before work started I was required by SCE to advance $31,000.00 to SCE as a deposit to begin their work. After reviewing the quality of their work (which was unacceptable) I sent a registered letter to SCE cancelling our contract with Steven Heller and SCE on January 13, 2011 and requesting a refund. Although several additional registered letter requests, phone calls and a personal visit to the SCE offices was made I have not been able to get my refund. Therefore, I am hereby requesting a full refund of my $31,000.00. I would appreciate your assistance in assisting me in obtaining my refund of $31,000.00 from Steven Heller and/or SCE.

Rating CategoryRating out of 5
quality
1.0
value
1.0
professionalism
1.0
responsiveness
1.0
punctuality
1.0

$17,000

    Contact information

    unknown, Boca Raton, FL 33428


    Licensing

    State Contractor License Requirements

    All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our State Contractor License Requirements page.

    *Contact business to see additional licenses.


    Service Categories

    Doors,
    Windows,
    Water & Smoke Damage

    FAQ

    Steven Heller General Contractor is currently rated 1 overall out of 5.
    No, Steven Heller General Contractor does not offer free project estimates.
    No, Steven Heller General Contractor does not offer eco-friendly accreditations.
    No, Steven Heller General Contractor does not offer a senior discount.
    No, Steven Heller General Contractor does not offer emergency services.
    No, Steven Heller General Contractor does not offer warranties.

    Contact information

    unknown, Boca Raton, FL 33428