Our tile contractor gave him our name to give us an estimate on the work we wanted done on renovating both our bathrooms floor to ceiling. He made an appointment with us that he confirmed, kept & arrived on time. At that time I had a plan to switch the master shower with the toilet to give us a larger shower in the corner. Guy suggested another way to make our shower bigger, more user friendly & not move doors & make more work. His contract stated that it would take 35 work days or nearly 6 weeks to complete all the work. It also specified when we would make payments & how much work would be done prior to payments. We understood there may be a couple of things not covered in the contract because they could not see under the tub or in the walls behind tile. We approved the plan & he came back a week later with a comprehensive computer generated estimate that was twice the budget we had hoped to stay within. We had previously had another bid that was not in writing, not specific & half the price. We agreed to the bid of Hernandez Construction because it covered everything in each bath, each closet, each door, and each wall. The bid was totally specific as to who was responsible for purchasing every building supply & fixture we wanted. We were purchasing some of our items through Direct Buy so we were responsible for those & it was noted on the contract. We signed the contract because it was so thorough & we felt like he was completely honest & above board with every issue. We were called prior to work starting & told what to remove from what area & how to make the house more accessible by taking down pictures, shelves & accent pieces in the hall so they didn't get knocked down during demolition or work on the rooms. On Sept. 13, 2010 the work was started at 8:00 am. Guy's father, Guy Senior & Gabriel showed up to tear out the entire bathrooms. They covered our wood floor with paper, our carpet with plastic & put up plastic sheeting walls to confine as much dust & mess as possible. Every day they showed up on time, worked all morning, took their lunch outside sitting on the concrete steps. I finally couldn't stand the thought of them working so hard & not being comfortable during lunch that I gave them each a folding patio chair to sit in during lunch. Every evening when they left my house was as neat as it could possibly get with all the work going on & all our things scattered over the house. They also put their working materials, folding chairs & tools either in their trailer or our garage. They left my yard clean & picked up any mess they had made. We needed a toilet in our master for a few days so they worked mostly on the hall bath. They were here every day for at least 3 weeks before the tile contractor was contacted to take measurements for tile & granite countertop installation. Both these men & the younger Guy were very respectful, listened to any concern I had, never swore, never raised their voices to each other, never spoke Spanish in front of us & just listened to a soft radio & laughed at times. We felt they were totally trustworthy. We left our home many times during this renovation (sometimes for days at a time) & were never concerned about our home or possessions. We have two very nosey, playful dogs that wanted to play with the workers. We had to put them out on the patio & lock their dog door so they wouldn't be in the way. When we were not at home the guys left our house locked, alarm set, & dogs in with their door open. They were very easy to work with. When I had a question about an electrical plug fixture that we had agreed to which wasn't in one day, Senior called Junior & within minutes we had a fixture in the exact spot where I had wanted it. Turns out it was misstated in the contract to put a fixture at each sink instead of 2 in each bathroom. Sinch our master only had one sink it was confusing for Senior. I was in the bathroom & bedroom many times observing what was going on & they patiently explained what they were doing & why. We now have two beautiful bathrooms that came out better than we had expected thanks to this crew. Any time I had a question that the guys on scene couldn't answer they called the owner Guy Junior & got an answer for me. This renovation came in 4 days over the budgeted time because the tile contractor had a problem with personnel & held it all up for more than a week. It also came in only $250. over budget because we had to purchase a couple items that were not seen until the sheetrock, tubs & tile were removed. We were approaced on this cost & agreed to it before it was undertaken. If I could afford it I would have this crew here every day to update the rest of my home. When we get the money saved to update our kitchen we will definitely use them again. Believe me thay are trustworthy, kind, caring, wonderful to have around & work with & a joy to have in your home. Anyone is at liberty to call me or come & see the work done in our home. Guy can give you our phone number. You can't go wrong with this construction company.