IT WENT SOUTH REAL FAST AFTER HE TOOK OUR MONEY. HE WAS CONTRACTED TO DO A SITE MAP/PLOT MAP FOR A NEW METAL BUILDING SIGHT. WE GAVE HIM ALL THE EXAMPLE INFORMATION AND WHAT WAS REQUIRED FROM THE COUNTY, ALONG WITH THE COUNTY'S WEB SIGHT FOR ALL THE INFORMATION HE WOULD NEED. HE TOLD US HE COULD DO IT NO PROBLEM !! SAID HE'D DONE THIS STUFF BEFORE. WE PAID HIM $500.00 DEPOSIT. HE DREW UP A SIGHT MAP, ELECTRIC MAP OF NEW BUILDING. HE CALLED AND TOLD ME WHERE TO PICK UP THE NEW PLANS, SAID THEY WERE READY FOR PLAN CHECK AT THE COUNTY PERMIT OFFICE. I WENT TO THE COUNTY PERMIT OFFICE FOR PLAN CHECK WITH MY PLANS. MY PLANS WERE REJECTED BECAUSE THEY DID NOT MEET COUNTY MIN. REQUIREMENTS. I CONTACTED BASE DESIGN & DRAFTED WITH THE COUNTIES REJECTION LETTER AND WHAT NEEDED TO BE CORRECTED. HE CALLED ME A COUPLE DAYS LATER SAID THAT THE PLANS WERE READY AGAIN AND NEEDED TO BE PICKED UP AND PAID FOR AGAIN AND TAKEN TO THE COUNTY FOR REVIEW AGAIN. HE SAID EVERYTHING WAS CORRECTED AND READY FOR PERMIT. TOOK THEM TO THE COUNTY AGAIN. AND AGAIN THEY WERE REJECTED FOR THE SAME PROBLEMS. I CALLED HIM AND TOLD HIM THAT HIS DESIGNS WERE REJECTED AGAIN FOR THE SAME PROBLEMS AND HE JUST COULDN'T BELIEVE IT HE SAID. AND WAS GOING TO CALL MY COUNTY PERMIT OFFICER. HE SAID HE WAS GOING TO SET MY COUNTY STRAIGHT AND TELL THEM JUST HOW THINGS ON THIS PROJECT NEEDED TO BE DONE AND THAT IT'S NOT HIM WITH THE PROBLEM, IT'S MY COUNTY PERMIT OFFICE THAT CAN'T DO THEIR JOB. HE COULDN'T PLOT OR DRAFT ANY ONE OF OUR PLANS CORRECTLY. HE HAD OUR HOME IN THE WRONG PLACE ON THE SITE MAP AND OUR GARAGE WAS ATTACHED TO THE WRONG SIDE OF OUR HOUSE. HE COULDN'T PLOT TOPOGRAPHY LINES USING THE PROPER MEASURMENTS. AND WHEN THIS WAS AGAIN BROUGHT TO HIS ATTENTION HE AGAIN BLAMED THE COUNTY FOR BEING STUPID. I FINALLY HAD TO HIRE SOMEONE ELSE TO DO OUR PROJECT. BASE DESIGN & DRAFTING THEN SENT ME AN EMAIL TELLING ME THAT HE WAS CANCELING HIS CONTRACT AND THAT I OWED HIM MORE MONEY.