Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Marion, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Marion, AL?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Marion

Avatar for American Property Works
American Property Works
4.1(
23
)

Serving Marion, AL and surrounding areas

In business since 2016

Free estimates

Emergency services offered

"These guys are unbelievable! We had major water issues in our yard and we hired them provided drainage capabilities that would move the water from our yard to the gutter in the street. They not only did an outstanding job, they worked in the rain, thunder, and lightening to get the job done. They solved our problem. We worked with Jake and words can't describe how helpful, courteous, and conscientious he is. There was a lot of excavation involved and they were really efficient, replacing all our sod and then cleaning up after themselves. I would enthusiastically recommend this company."
French drain
Side view
Channel Drain
Swale
Response time2 days
Recommended by82%of homeowners
Avatar for Get By Patch
Get By Patch
5.0(
6
)

Serving Marion, AL and surrounding areas

In business since 2020

Free estimates

Small jobs welcome

"They done an amazing job! Got the job done efficiently and it looks amazing now! We couldnt be happier! Would recommend to anyone for anything asphalt-related! Not to mention their customer service was absolutely amazing, very nice people. Great company all the way around!!!"
#1 pothole patching
#1 pothole patching
#1 pothole patching
#1 pothole patching
Response time3 days
Avatar for LCR Solutions
LCR Solutions
5.0(
5
)

Serving Marion, AL and surrounding areas

Free estimates

"Larry’s Grading Solutions did an exceptional job clearing my woods. The work was meticulous and detailed. The price was most competitive. Larry and his crew are some of the kindest people you’ll ever meet."
Excavation
Landscaping Project
Excavation
Landscaping Project
Excavation

+19

Recommended by100%of homeowners
Avatar for Finch Masonry and Construction
Finch Masonry and Construction
4.4(
10
)

Serving Marion, AL and surrounding areas

In business since 1980

Free estimates

"Awesome gentleman, whose quality of work and affordability are equally awesome! His craftsmanship and product is the talk of my neighborhood and has spurned a number of request for his contact information. I highly recommend Finch Masonary and Construction for masonary work of the highest quality."
Recent Projects
Recent Projects
Recent Projects
Recent Projects
Recent Projects

+3

Response time11 hrs
Response rate89%
Recommended by77%of homeowners
...
Showing 1-10 of 55
Asphalt Driveways questions, answered by experts

You should not attempt to install your own driveway. Whether working with asphalt or pavement, this is a complicated project that requires special equipment. Talk to some nearby asphalt or paving professionals and discuss your particular needs—it’s a good idea to get a few quotes and look at the company’s past work.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

Yes, you can retrofit an existing driveway, but this usually involves cutting grooves into the driveway, installing the heating elements, then sealing them. While this is much less expensive than typical heated driveway systems, the final appearance could be diminished. Speak with a driveway paving company to confirm which design method is best for you.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Marion, AL homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.