Showed up between 9-10 the first two days and left at 3. 1st day one crew spent whole day on 3rd floor installing 12 plugs and running wiring to them. 2nd day same crew ran 12 recessed light fixtures and wire to them and two recessed light on balcony, left at 3 leaving a set of ceiling fans not working and 2 sets of lights not working. Another crew showed up around 11 to install new breaker box and redo wiring and add ground 3rd day nobody showed up, called office at 10 was told there were emergencies, finally someone showed up at 11 and promptly went to lunch, then went to third floor until 3 and left, not doing anything. Fourth day crew shows up was told to remove shoes or wipe feet good as they had to walk over carpet and it was raining outside. One of the workers copped an attitude with that so the crew left. The office called and a long conversation about what did and did not get done including the attitudes transpired and the office lady continued to make excuses so I told her to tell them to go home until the attitude changes and told her to tell the owner to call The owner called and I asked for a meeting in person, he said he would call back. After a whole day with no call I left an e-mail to just terminate the contract and have the owner come and see what material and labor was used. He showed up the next day, refused to see anything and gave me an invoice for $3400. There was nowhere near that much material or labor used and the invoice was not itimized.
Description of Work: Upgraded breaker box, roughed in 4 plugs per room and 4 recessed lights with a switch in 3 rooms added in attic in 2 1/2 days on job site. Did not do the following: add plug for tanning bed in attic room, install weatherproof plug on 3 decks, install light, wiring and switch for stairs to rooms in attic, install light, wiring and switch at first floor furnace closet, install light, wiring and switch to stairs going ino basement, install light, switch, and wiring in bedroom hallway, inspect, repair or replace wiring, plugs, light and switches in garden shed, remove 240 box and wiring from garden shed, chech all wiring and light receptables under house, repair box, plugs and switches in media roo closet, repair light, switch and box in closet of kitchen, check, repair or replace wiring, switches, plugs and lights on all three floors or remove if not necessary, run service line, add breaker box for work shed, make sure house is safe electricially.