Owner-Operated. Cost is determined by the job. I have a very well stocked service truck and trailer available to you with a variety of specialized tools. Make a list, buy the known parts or materials required for your projects, and schedule an appointment.
Handymen
Yes
Number of Stars | Image of Distribution | Number of Ratings |
---|---|---|
72% | ||
13% | ||
7% | ||
7% | ||
2% |
"thank you although i was acting as a sam's contractor....i do appreciate the angies list comments and grade... shalom dan"
"The customer was told I work by the hour...period...she responded with satisfaction after each and every assignment she gave me...the only time she "choked" was when it was time to pay.......then she let off her "steam" lets call a spade a spade.... on my second day of work i sensed "uneasiness" and asked her if she was pleased with the work...she said she was..... i wouldn't work for her again.."
"thank you for the kind words, and the fresh eggs.... dan"
"thank you member..we enjoyed working for you and would gladly work for you again...."
"THANK YOU MEMBER"
"due to circumstances beyond my control i was not able to meet the verbal commitment .....i called as soon as i was able to recognize that i was not going to be able to do THIS project....i appologized for the inconvience, as the problem on my end was unforeseen.....the problem was not another job."
"with regard to the the chain saw, all tools need to be serviced, usually on site, the chain saw worked until it jumped the chain about 0300 in the afternoon.....which required a mandatory re tasking of work to accomplish the ultimate. goal.. , The cousin showed me a wood chipper that was to be used on site to dispose of the palm branches, therefore eliminating any need to take any material to the citizens collection center or dump.....Three full trailer loads of material were collected, loaded and hauled away to the dump on the work.. day....due to the fact that the wood chipper was not functional and needed further servicing,(in this case the rebuilding of the carburetor on a briggs and stratton engine.) this extra time disposing works against the pruning time allotted for the project and changed the whole dynamic of the project.....I always indicate that i allocate TIME (12 man hours) to the project, not necessarily project completion. for $XX.XX.....If i could guess and foretell the future i would be rich and not need to work in real time required and deal with people that only hear what they want to hear.. It seemed perfectly clear to me that the cousin that contacted me was well aware of my terms to . come a perform the palm tree service on a time /material basis and not on a project completion basis.... The whole event began to deteriorate about the time that mini agreements relative to time remaining for the day and work performed that the cursing began to accuse me of misrepresenting my labor dedicated to the project.... I did not work for Member the person that is acting as a third party intermediary and who wrote this post ..... Member was not there nor have i talked with her or met her...Member posted this post based on third party hearsay..from her cousin. ... the cousin was required to go to the dump to present her drivers license and water bill to the managing authorities,,,,,the trash came from her property, i just hauled it for her.....I cannot enter the dump site with other trash than my own personal trash....There was also extra trash not related to the project that was taken to the dump site at the request of the cousin. re, the cousin working on her own property....I never requested help from the cousin, and it is not my position to ask anyone what they are doing on there own property... there were no extra charges made on that day. the cousin again must have been hard of hearing... I only suggested another time period to come back another day,,,,, BE ADVISED I WILL NOT EVER WORK FOR THIS PARTY EVER AGAIN"
"after i suggested pressure washing the area rug ( she also said it was of mininum value to her) she agreed to pressure washing the rug. The rug was not left outside at the end of the day. i dont recall exactly how many doors,12 if memory serves, had the old weather strip removed, sized and fitted. Julie was given the option of us sanding the doors or to just touch them up. I would have gladly sanded the doors, which can take considerable amount of time. The doors were damaged by large dogs scratching and gouging the doors. Julie agreed to the touch up. no mention of repairs in the bathroom was made on this commentary. no mention of a make shift, functioning repair to her non funcioning ignitor on the kitchen stove.... she was extatic for the cost saver....."
"what is not mentioned about the panel removal is that great care was exercsised in the removal of the trim,(expensive) in order to have is available for future painting, use etc....thursday i positioned my trailer on site for garbage disposal and was removed on sunday after other material was hauled off without consulting me as to the the nature of material that was left outside, staged, (for loading purposes). His wife was concerned about having an electrical 220 outlet repositioned to another wall. we discussed the options and i heard nothing else on the matter. She also asked to remove a 40' section of gas line that was feeding the fireplace. work performed satisfactorily....she asked me to remove and dispose of a light fixture from the living room. done. what is not mentioned is that i also removed a large bar 9' long by 2' 6" wide by 40 high, work accomplished without collateral damage.. two wall shelves, fixed to the wall were removed without collateral damage..... another cabiner with sink , (including removal of associated plumbing ) was removed without collateral damage....paneling in converted garage was also removed without collateral damage. all hardware associated with any electical, drapes, door hardware etc, was miticulously removed and stored for future reinstallment..... solar water heater , three 3 x 8 foot panels and associated materials were removed from the roof and disposed of. i figure about 20 hours of labor went into this small project, which is probably why he paid me without any hesitation.... ps notice how he is not happy with any of angies list people, pps i had not finished my work when he said we were not to return to trim a bush that was growing into the house , he never commented and said he was dissatisfied with any of the progress that was accomplised during the project, the member was also informed that though i was available on saturday i also told him that i prefer not to work on SHABBAT and opted to work on sunday which i did,,,, the member did not notice or comment on that i had help from my brother and his friend in order to remove the large bar. ( considerable heavy) to expedite the neatness factor and disposal factor...i also had help on sunday with the lowering of the solar panel from the roof (safety issues) he got a pretty good deal for the amount of work actually accomplised. he even got the gas line capped properly when this was not a part of the original project.. and yes i did not finish removing the wall paper in the bathroom.....maybe i was scatterbrained......the member not recognizing the method of MY madness ."
"thank you."
"please look at her initial comments on my work"
"thank you."
"thank you."
"thank you."
State Contractor License Requirements
All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our Find Licensing Requirements page.
*Contact business to see additional licenses.