Description of Work: Hired to do a small bathroom,adding a entrance door, replace 3 doors, repair and replace siding on side of house. Demo in basement, install a kitchenete. |After 3 months of consistent days of no shows, major problems every week, I gave them a dead line that was agreed upon. Last day of deadline nothing was completed. No hot water in bathroom and kitchenette, doors had to be repaired and replaced, damaged shutters had to be replaced, Tile work incomplete, and the list goes on. They damaged floors with several floods, emplyees going threw my tool room, yes on camera. Final billing was a joke they billed me double the original quote when asked for the them to provided a accounting of project they increased bill to over 50,000. The billing included double and triple billed for front door and 3 toliets. They claimed to give me a break on price and gave me 10,000 off. Except that was my original down payment. |I had to hire another contractor to complete the job and redo major items, cost me 8,000. Had to hire someone to reinstall front door and replace a basement door that was wrong size door jam. Had to install a plumbing access door in floor to repair crossed water lines, reason there was no hot water in bathroom and kitchenette. |The owner only came to job site after I fired the entire crew and kicked them out of my house. He had the opportunity to correct the issues but choose not to. |The worst experience possible.