The lead guy was Mike Mathis. He knows his stuff. It was a 24' x 36' ft full two story garage attached with an enclosed 8' x 24' breezeway. The garage has nice plywood finished walls and ceilings, fully insulated, and with lots of electrical outlets. For my purposes, I needed the top floor to be able to hold a lot of weight, so the garage was built much stronger than what is required for codes. It is partially embedded in a hill, so great care was taken to seal the cinder block foundation and provide water drainage. I did need to correct some small details along the way such as the garage doors were supposed to have windows and they initially didn't and I had to remind him that I wanted plywood on the walls and ceilings. Also, one of the garage door openers stopped working a couple weeks after the garage was finished and it took 3 phone calls and two months to get somebody to come out and fix it. Other than that, I am very happy with the job.