Project only took a little more than a week. First couple days were spent removing the old shower and removing the the doorway and building up walls where needed. Day three, Arne's plumber installed fixtures and new shower. Day four, five and six was replacing drywall and taping ,mudding, and sanding. Next few days were spent painting which Arne normally subs out but in this case, he did the painting as it fit his schedule and eased the job for us. On the final day, day 9 he cleaned up and put on the finishing touches and cabinets. Through out the project, Arne's crew kept the mess and asso. dust to a minimum. Can't say enough good
ADA Contractors in Roberts are rated 4.0 out of 5 based on 9 reviews of the 2 featured Roberts pros
The Angi rating for ADA Contractors in Roberts is a rating based on verified reviews from our community of homeowners who have used these pros to meet their ADA Contractors needs. Angi’s review system takes into account ratings on price, quality, timeliness, responsiveness and feedback for Angi Certified Pros.