Tampa Bay Dock Repair

Compare quotes from top dock builders

Get quotes from professionals in your area!

Reviews in Tampa Bay for Dock Repairs

Storm Marine
5.0
They did and excellent job, they were quick to come out and the work was done efficiently and very high quality. We will use them when we renovate the rest of the dock.
- Mark P....
Heritage Docks, Inc
5.0
Heritage Docks helped us design, permit and install a new lower landing dock extension to our existing dock. They were extremely professional, thorough and very nice. The project had some permitting delays, not related to Heritage Docks, which they helped us navigate to bring the project to completion. In the end, Heritage Docks installed a high-quality, very functional lower dock landing. We would highly recommend them!
- Beau S....
Designer Decks
5.0
The dock replacement went very well. Used a composite material for the dock surface. Was able to use most of the existing piers.
- Frank G....
GULFSIDE DOCKS COASTAL CONSTRUCTION
5.0
They removed my old dock efficiently and in a timely manner. Since the dock was very unstable I was concerned about the high winds during hurricane season and they handled the demolition quickly and efficiently for me. I intend to have them build a new dock shortly.
- Joanne B....
Docks Inc
5.0
Bruce ( Salesman )coordinated everything for me. He came down twice as he was my first quote and my last. I obtained several estimates and got many ideas until I finally decided what I wanted. We changed location of the dock as well as design and height. He coordinated the piling wraps, the electrician, the water, as well as the dock builders. We communicated by phone and e-mail. I would e-mail whenever I thought of something whether it be on a Sunday or at 6am not expecting a response until a regular work day and time, but always got one immediately. I was at work for most of the work done but he kept me in the loop and even sent a picture by text when it was done. They did a wonderful job on the dock and the electrician was great too.
- Debra L....
Dock Piling Restoration
5.0
The job was completed and now I have a functioning dock that will last for years to come. I had no idea this type of repair was possible. We were looking at replacing the entire dock structure prior to talking with Dock Piling Restoration.
- Peter M....
DE BAYLO MARINE INC
5.0
My dock had deteriorated seriously; lower step had fallen off and was floating (tied to dock) the dock itself had began to feel unstable. The DeBaylo team quickly found the structural deficiencies which had led the lower budding to fall off and laid out the steps necessary to repair the dock. 3 days after the initial visit Gary DeBaylo and 2 others of his team showed up around noon with all the necessary tools and wood etc. They lifted the lower lauding out of the water, pressure cleaned it reinforced the dock and reinstalled the lauding feuders in about 4.5 hours and thoroughly cleaned area.
- Barbara A....
Island Marine Construction, Inc.
5.0
Tim and Joni and crew were the best. The old dock and pilings were completely disassembled and taken away. New pilings and dock decking were installed with all stainless steel hardware. The new pilings were all wrapped with a heavy gauge plastic to prevent sea creatures from boring into the wood. They even sent someone out to paint the wood bracing to match the deck color. A few little hiccups were addressed with professionalism and promptness. Overall excellent job.
- Alan M....
Speeler Enterprises
5.0
I got 3 bids prior to Speeler. Their bid was not the cheapest, but their proposal was better than the others. I looked at the docks around, and I got a lot better docks for the same price. I was away at work during the day and came back to see the old dock hauled away. Instead of nailing the dock down they used screws, so it doesn't split the wood and it stays longer. They took care of my environmental permitting. They do what they say they are going to do. Because of a hurricane, one of my docks was damaged. I called them and a guy came out. He helped me get my boat off the dock and secured it temporarily. He came back the same day and found a used transmission for me. He charged me less for that, but got me going.
- David H....
Quality Docks LLC
5.0
Great job by Quality Docks. Really good price, great quality, lots of communicatiin, and the crew did a really great job of taking care of the details.
- Craig C....
Ram Marine Services Inc
5.0
The dock had collapsed on one end. They put the new pylons in and replaced the structure underneath to hold up the dock. They did a fantastic job and it looks really good.
- Sandy T....
Advanced Marine Construction
5.0
We sought three bids for the work (I say and quot;soughtand quot; because one contractor disappeared on us before providing anything) and AMC came in with the most detailed and fairly priced quote. It was also clear that John has serious pride in AMC's workmanship and building specifications. We also liked that it was an all-in quote. John's wife, Lisa, handled all permitting and variance matters, which all went extremely smoothly. After the variance and permit were issued, it took a while to commence the project (though they did start demo earlier than estimated when a prior project went into standby mode) and it would sometimes take a couple or few days to hear back on an inquiry, but we DID always hear back. I believe this is just a matter of how successful and busy they are, and it's John and Lisa running the show (not a huge company). When it came time to select our dock material, John turned us on to a product (Azek) that we weren't even aware of. I did a fair amount of research on it and was thrilled to be given the alternative to composite under the same estimate. The (much) lower heat retention allowed us to choose the darker color we were hoping to achieve out there. We were only there during one day of the work (and Scott was pleasant as could be) but always noticed that the work site was well maintained. The finished product is gorgeous. From the wrapped pilings (why doesn't everyone do that??) to the tighter-than-required fastener spacing, this thing is clearly built to last. We look forward to enjoying it for many years and will definitely use AMC when we are ready for boat lift.
- Gregory H....
Curtis T Campbell Marine Construction Inc
5.0
Curt was GREAT! He came out when nobody else could and he gave us an estimate, stuck to his word and did quality work. Highly recommend his services for Marine Construction. And he's a nice guy too!
- Debra W....
Docks Inc
5.0
I had nothing but a Good experience dealing with Docks, Inc… As I usually do, I got three quotes and Docks, Inc. was the most reasonable considering what they proposed to provide and the material to be used… (Maximum square footage, two railings, step-down platform, PVC decking) The installation started when scheduled and was done within their quoted timeframe… The crew did a very professional job and left the site with NO signs that they were even there… They worked quickly, quietly, and efficiently, with well coordinated “teamwork”… It's nice to watch professionals at work (... per an Industrial Engineer) The installed dock looks great and is to our complete satisfaction… Would/will recommend to anyone who asks…
- Frederick L....
Speeler Enterprises
5.0
FROM THE SALESMAN TO THE WORKERS WE WERE IMPRESSED WITH THE COURTEOUSNESS AND RESPECT WE RECEIVED. THE WORK TEAM WERE TRUE CRAFTSMAN AND VERY PROFESSIONAL. THE COMPANY EVEN SENT A COMPANY EXPERT TO INSPECT THE JOB WHEN IT WAS COMPLETED. WE HIGHLY RECOMMEND THIS COMPANY FOR REPLACING DOCKS.
- George &....

Dock Repair in Tampa

5.0

(89)

New Port Richey, FL

Angi Certified
Offers Coupon
Recent Review: Ed and Amy did interior painting for us last year and we were very pleased. We did not hesitate to call them to give us an estimate to repaint the exterior or our house. They promptly came in February and provided us with a realistic estimate and their schedule was open for April. That worked for us and we agreed to go ahead with them. On day one they pressure treated all the sides of the house. Day two was the prep work of covering windows, etc. Painting started in Wednesday and finished up on Friday including the painting of our front and very large back lanai. Ed and Amy did an excellent job and we are very pleased.
4.9

(60)

Pinellas Park, FL

Super Service Award
Angi Certified
Recent Review: Excellent service. Would hire again. Couldn't be happier with the whole process. Brad and his team were timely, super responsive and did exactly what I expected.
3.0

(2)

Lutz, FL

Recent Review: It was good. They showed up on time. They moved everything.
1.7

(3)

Sarasota, FL

Recent Review: Duncan Seawall Dock and Boatlift built a dock and lift on our neighbor's property. The neighbor's water fromtage was 30 feet...only 30 feet of water frontage on a tidal canal. The Manatee County 'setback' requirements for this small frontage is 5' on each property line leaving 20 feet of usable space. Duncan placed the boatlift and dock 12' into our frontage. The 12 feet is based on two riparian surveys obtained by the neighbor and by us. The neighbor added a floating platform for a total structure width of 44+/- feet so the final structure was 12 feet into our frontage, in the 10 foot setback where no structure is allowed and several feet into the other neighbor's property.This problem should have never occured. The contractor should have advised the home owner that his chosen dock/boatlift were too large for the 30 foot frontage. The contractor should not have built part of the structure in our frontage. The contractor should have never proceeded without a riparian survey.The Contractor refused to move or modify the structure. The Homeowner had to move the structure at his own expense. This all occured at 6717 and 6719 3rd. Street Court West, Bradenton, FL 34207.
4.0

(21)

Clearwater Beach, FL

Recent Review: After calling several companies, and receiving a few verbal estimates, we decided to go with Priority Marine, because of their prompt and professional response. The company presented a professional estimate in writing that included three options. The choices were repair work, replacing the old dock with a new dock, and the choices of material to be used. We found this very helpful and decided on a new dock. The work was done in one week. We watched the team working hard, especially considering the extreme heat in July. The team was punctual and left the property perfectly clean after the work was completed. The time frame from contacting Priority Marine to finishing the building the new dock took just about three weeks. We can highly recommend this professional company, Priority Marine.
5.0

(1)

Brandon, FL

Recent Review: Everything was excellent. They stuck to the budget and showed up on time when they said they would be there. And they used high quality materials..
5.0

(1)

Brandon, FL

Recent Review: JAKE AND HIS CREW DID A GREAT JOB. ALL WORK WAS DONE IN THE MOST PROFESSIONAL MANNER USING THE BEST MATERIAL AVAILABLE, RIGHT DOWN TO THE FASTENERS. HE EVEN GRINDS THE TOPS OF THE PILINGS TO A NICE ROUNDED TOP EDGE AND BEVELS THE ENDS OF THE DECKING. HE REALLY BUILDS A BEAUTIFUL DOCK.
5.0

(1)

Odessa, FL

Recent Review: The crew of three was on time each day, working non-stop. Very respectful of my yard and home. The lanai was open, so they had access to electricity, cleaned up each day and finished the job on schedule. I was told each day of the plan and it was done.
4.9

(8)

Hudson, FL

Recent Review: The job was done very well from end to end. They were very responsive to providing a quote, scheduling the work, keeping me updated and responding to questions after they were done. They spent additional time after the concrete was poured to ensure that everything was set and completed just right. I would definitely recommend this company.
3.0

(1)

St. Petersburg, FL

Business Description: Florida State Certified General Contracting Company that engages in the new construction of docks and boatlifts that are located in the Pinellas county water ways
4.7

(57)

Lutz, FL

Angi Certified
Offers Coupon
Recent Review: The dock replacement went very well. Used a composite material for the dock surface. Was able to use most of the existing piers.
5.0

(4)

Oldsmar, FL

Recent Review: Bill started on time, and went overboard on the things he did to strengthen the base of my dock. The structure of the dock was in need of repair, and he fixed all of that. He started the job when he promised and worked every day until completion. Every day he cleaned up and there was no mess when he went home for the day. The job took 3 1/2 days to complete, and it looks fantastic. I highly recommend Dock Medics of Oldsmar.
5.0

(3)

Tampa, FL

Recent Review: The job was completed and now I have a functioning dock that will last for years to come. I had no idea this type of repair was possible. We were looking at replacing the entire dock structure prior to talking with Dock Piling Restoration.
3.7

(3)

Venice, FL

Recent Review: The dock had collapsed on one end. They put the new pylons in and replaced the structure underneath to hold up the dock. They did a fantastic job and it looks really good.

Rate Angi’s Dock Repair in Tampa

Featured Rating:
4.7

Dock Repair in Tampa are rated 4.7 out of 5 based on 254 reviews of the 14 featured Tampa pros

The Angi rating for Dock Repair in Tampa is a rating based on verified reviews from our community of homeowners who have used these pros to meet their Dock Repair needs. Angi’s review system takes into account ratings on price, quality, timeliness, responsiveness and feedback for Angi Certified Pros.

Frequently Asked Questions & Answers about Dock Repair

What services are related to Dock Repair?

  • Dock Builders

  • Deck & Porch Contractors

  • Garage Builders

  • Carpenters

  • Deck Cleaning Services

  • Pressure Washers

What do customers in Tampa say about Dock Repair?

They did everything on time, on budget and without much hassle, and they cleaned up well. It was a good job. I called three different companies and they gave me the best price and they were the most responsive of the three companies. When I build a new dock, they'll be the first one on my list.