Matching on Angi
Ashland, MA
Middleboro, MA
Worcester, MA
Dedham, MA
Waltham, MA
Billerica, MA
Lynn, MA
Walpole, MA
AUBURNDALE, MA
Westwood, MA
Winthrop, MA
Quincy, MA
Middleboro, MA
Somerville, MA
Raynham, MA
Braintree, MA
Salem, MA
Sudbury, MA
Malden, MA
Devens, MA
Drywall
Handyman
General Contractors
Woodworking
Top Quality Remodeling info@topqualityboston.com DATE 10/25/2014 EXPIRATION DATE ACTIVITY QTY RATE AMOUNT Bathroom Remodeling - Remove and replace tile on walls and floor. - Remove and replace bath tube, Vanity, toilet, fixtures and hardwares. - Install cement board on floor and wall where tiles will be installed. - Remove door and Open wall in bathroom - Install new drywall as necessary. - Do plumbing and electrical as necessary. - Paint entire bathroom. - Replace toilet and light fixture in master bathroom 1 4,500.00 4,500.00 Electrical - Replace all outlets and outlets plates - Replace all switches and plates - Replace thermostat 1 1,400.00 1,400.00 Interior Painting - Repair walls feeling holes and patching cracks - Apply two quotes of paint on wall in entire apartment - PAINT AND SUPPLY ONLY 350 0.00 0.00 Flooring - Remove existing floor in kitchen - Refinish floor in kitchen 1 650.00 650.00 ACTIVITY QTY RATE AMOUNT Kitchen Remodeling - Remove all cabinetry knobs - Fill all holes from existing knobs and drill others for the new knobs - Paint and refinish cabinetry in kitchen - Remove existing backsplash - Install new drywall - Install new back splash - Remove existing countertop - Install granite countertop - Install new sink and new disposal 1 5,200.00 5,200.00 Miscellaneous - Remove and throw away two furnitures - Install shelfs in closets - replaces existing closets door for bi-folder door. - Relocate duct vent covering existing hole - Replace all windows blinds 1 1,100.00 1,100.00 Disposal - Disposal Fee $850 (INCLUDED) 1 0.00 0.00 Kitchen Appliances - Stainless steel Fridge - Stainless steel Dish washer - Stainless steel gas cooktop - Stainless steel Hood - Stainless stell cooker and microwave combination 1 5,100.00 5,100.00 Appliances Installation - Replace all the appliances 1 900.00 900.00 Masonry - Apply mortar to secure falling rock 1 0.00 0.00 * All Material and appliances Included SUBTOTAL 18,850.00 DISCOUNT 10% -1,885.00 TOTAL $16,965.00 Accepted By Accepted Date